So everyone is meeting at hd. Then two groups split up.
If the 35 and up is too big does it get broken down to minimize mile long of rigs at one time?
Those who use trailers will unload at trail head. More time will be needed help split the groups.
At the moment im tentative as long as I have working rig. Ill know after next weekend.
Sent from my SCH-I535 using Tapatalk